bauer mc 86

$333.00

The total area of the diaphragm walls constructed was nearly 29,500 m². manga mc anti naif The work was carried out using a BAUER GB 50 hydraulic grab and a BAUER MC 86 duty-cycle crane Polymer slurry and reinforcement cages for stabilization During the work, a polymer slurry was used to stabilize the excavated trenches

Quantity:
Add To Cart